• New
Metal base
Metal base
Metal base
Metal base
Metal base
Metal base
Metal base
Metal base
Metal base
Metal base
Metal base
Metal base

Metal base

The metal base adds height to your modular unit! It is a sturdy and durable construction, made from a heavy-duty frame with 3 mm thick sections. The unit is securely anchored to the base at multiple points with Φ16 holes.

The base consists of RHS 100x50x3 mm and SHS 50x50x3 mm steel beams. The disassemblable base features Φ16 holes, with its sections connected using M14x140 bolts, double wide washers, and lock nuts, all included in the package.

The base is available in the same colors as the modular unit (White RAL 9002 - Silver RAL 9006 - Gray RAL 7015).

Oikiskos Dimensions
Metal base
* Base height
* Color
* copy of Construction type
* Frame Holes
* Guarantee
* Production Time
Offsetting estimated CO2 emissions
Total: 0
 

The Metal Base Ensures:

Protection from Floods and Other Disasters

In areas with high flood risks or other natural disasters, an elevated base can protect the modular unit from water damage and other destructive elements.

Structural Functionality

An elevated base raises the unit to the required height, making it suitable for accommodating tall vehicles or specific site requirements.

Safety

The metal base provides stability and durability under all weather conditions, as the modular unit is securely bolted onto it, and the base itself is anchored to the ground.

Aesthetic Appeal

Its sleek design enhances the modular unit’s visual appeal, giving it a modern industrial look.

Long-Term Durability

The metal base is designed for long-lasting use with minimal maintenance.

Additional Storage Space

An elevated base improves the ergonomics of the modular unit by creating an extra space underneath that can be used for storage.


Base Height Options:

  • 0.40 m

  • 0.80 m

  • 1.20 m

  • 1.60 m

  • 2.50 m

  • 3.00 m

Base Types:

  • Fixed

  • Disassemblable

The disassemblable base, although more expensive to manufacture than the fixed one, does not take up additional space during transportation, making it the most popular choice.

If you are purchasing a disassemblable base along with a new modular unit, select "Store Pickup" at checkout.


Frame:

  • Default: High-rigidity welded steel frame (default option).

  • Optional: Heavy-duty or ultra-heavy-duty frame (See frame construction details).


Coating:

  • One coat of polyurethane primer in white RAL 9002.


Base Anchoring & Modular Unit Fixation:

  • 4 anchoring points per 9 m² (white RAL 9002).

  • 4 modular unit fixation points per 9 m² (white RAL 9002).


Warranty

Choose the same warranty period as your oikiskos:

  • Default: 1 year (extendable)

  • Optional:

    • 1 year on-site (extendable)

    • 2 years (extendable)

    • 2 years on-site (extendable)

    • 3 years (extendable)

    • 3 years on-site (extendable)

    • 4 years (extendable)

    • 4 years on-site (extendable)

    • 5 years

    • 5 years on-site


Construction Time

Choose the same timeline as your oikiskos:

  • Default: Based on production flow

  • Optional: Fast Pass service for quicker delivery


Transport

  • The transportation of the base can be carried out using a curtain-sided truck or a conventional flatbed truck for widths up to 2.5 m, and a special transport truck for widths of 3.0 m.
  • If the base is supplied alongside the purchase of a new modular unit and is disassemblable, there is no transportation charge, as the product will be delivered with the same truck transporting the modular unit.
  • Otherwise, the transportation cost is calculated based on the length of the truck bed occupied by the base (e.g., 3 m of truck for a 3 m base, etc.).
  • The shipping cost is calculated automatically at checkout, or it can be added manually by checking the locations of the technical support points hereto include an additional material transportation service.


CO2 Offset Options

  • Default: 100% offset

  • No offset

  • 50% offset


Material Lifting

  • Unloading can be done via forklift or crane

  • If obstacles exist (trees, fences, cables), a larger crane is required

  • Send a sketch/photo for accurate lifting calculations

  • An initial setup is required, along with 0.5 hours of crane or forklift operation per 9 m² of the base.

Installation:

The Βase installation in the prefabricated unit is carried out by two skilled technicians.

Installation is not included in the prices. You can purchase the service of "Removing and/or installing a metal base" here.

Required work time: 1 hour / 9 m2.

Find here support locations to add the "Personnel Transport" option.

For island projects, please add:

Have a look here if accommodation is required, add "Personnel lodging and meal expenses".

The base is recommended to be placed on a properly sloped concrete slab, where it will be anchored using expansion anchors.

Power Supply for Installation:

A power supply is required for installation. If there is no connection to the grid, a generator ιs available at an additional charge.


    Dimensions:

    All listed dimensions are in Length × Width × Height.

    Images may not accurately reflect the actual color of the products.

    Not sure what you need? Purchase a Phone Support Package, and we will help you design your new base!

    You might also like

    Product added to wishlist
    Product added to compare.